Painting construction instructions

Painting construction instructions painting process

1. Must be applied to the flattened dense latex paint surface bar coater. There are strict requirements for wall substrates.
Surface pulverization is serious, large area is empty, cracks are serious, and construction is not recommended on uneven wall surface.
2. One day after the construction of the supporting primer, no dust is applied at the construction site, and the ventilation is good.
3. The temperature of the construction site must be greater than 5 degrees Celsius, more than 10 degrees. Construction is strictly prohibited when the humidity is greater than 90%, and tinplate is less than 80%.
4. Mix the A and B components together, insert the paint knife into the bottom and stir evenly (the mixing time is not less than 3 minutes). After mixing, make sure that there is no sticky feeling on the bottom of the jar. note! No water can be added to components A and B!
5. Please use the supporting fine roller roller construction. Do not wash after construction. Please use new roller for each construction. Wipe the floating hair on the drum before rolling to avoid falling hair during roll coating. When rolling, apply the appropriate amount of paint to the paint tray, and fully wet the drum, so that there is no dripping on the drum. The upper wall is evenly coated, and it is evenly coated from top to bottom. It is not suitable to roll back and forth many times. Pay attention to the hiding power of the paint, observe the leveling and ensure the uniformity of the color of the paint. The conductivity meter ensures that all the walls are evenly applied. . Generally, it can be uniformly rolled over once.
6. Inspection: After rolling, the light is inspected. In the case of insufficient light, the bending tester should be used to illuminate the wall with a running light. If the uneven gloss is found, the top coat is not evenly coated. Appropriate paint should be applied. After the qualified construction is completed, the wall surface should be uniform and uniform in color, and the color should be full.
Instructions for use:
After the painting is completed, it takes 7 days to use. It can be painted with a whiteboard pen, crayons and watercolor paint. Wipe with a dipped cloth and water, and wipe with a cloth and a centrifuge cleaner.

For more information on [Painting Knife], please visit: http://
Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

Sockolet is the a branch of outlet , widely applications in recent years,  used to connect branch pipe, can instead of the traditional tee use, to strengthen the branch pipe connection type, safe and reliable, lower cost, simple construction, improve the medium flow path, series standardized design selection of convenience and other advantages, especially for use in high pressure, high temperature, large diameter, thick-walled pipe increasingly widespread, replacing the traditional branch pipe connection method. sockolet made of high quality forgings,  material has carbon steel, alloy steel, stainless steel. connect method is  butt welding, socket welding, threaded like. Standard: MSS SP 97, GB / T 19326, pressure: 3000 #, 6000 #, etc.

Product:Sockolet Fitting
Size:DN8-DN900
Materials:A105,304,304L,316,316L,321, Q235,20#,16Mn,12Cr1MoV,F11,F22....
Pressure Level: 2000LB,3000LB (SCH80),6000LB (SCH160),9000 (XXS).
Standard:ASME B16.11,MSS SP-83,MSS SP -79,MSS SP-97,MSS SP-95,JIS B2316....
Crafts: Butt, Push System, Simmer 
Connection: SW,BW,TR.
Package: Wooden boxes,Wooden pallets,According to customer requirements.
Brand Name: HY 
Place of Origin: China (Mainland) 
Certification: ISO.UKS.SGS.BV 
Application: Chemical, Water, Oil and gas, Electricity
Sockolet Fitting-Threaded Elbow - socket elbow - socket welding pipe fittings - Socket Taiwan branch

Socket Fitting

Sockolet Fitting,Sockolet Fitting 3000Lb,Forged Fitting,Tee Sockolet Fittings

CANGZHOU HAOYUAN PIPE FITTINGS MFG CO.,LTD , https://www.pipefitting-china.com