How to properly install the urinal?

First, the installation of floor-standing urinal

1. The floor-standing urinal must first determine the installation and precise dimensions of the drain pipe to the wall tile when making the pipe.

2. When confirming the correct size, first seal the sealing ring to the drain pipe to prevent the urinal from leaking.

3. Apply sealant to the interface of the urinal rubber ring and the sealing ring, and place the urinal in the installation place. After the horizontal level is used to determine the horizontal installation of the urinal, draw the line on the bottom and upper and left and right sides of the urinal.

4. Confirm the installation position of the rear part of the urinal by calculation, and punch it and fix it with special accessories.

5. After installing the rear parts, apply a sealant to the gap between the urinal and the wall and the ground.

6. Test the water after installing the inlet pipe.

Second, the installation of wall-mounted urinal

The wall-mounted urinal is divided into ground drainage and wall drainage. The installation of the ground drainage should only pay attention to the height of the drainage outlet; the urinal of the wall drainage should not only pay attention to the height of the drainage outlet, but also the size of the urinal before the wall brick is made. To reserve the inlet and outlet.

Wall-mounted urinal accessories: screws, decorative caps, copper horse heads, aprons, urinal hooks, etc.

Structure Factory

Steel Building,Steel Structure,Steel Structural

Steel Structure,Sandwich Panel Co., Ltd. , http://www.nsprefabhouse.com