All-inclusive, half-packaged, clear-packaged

All-inclusive, half-package, clear package or other? Many people have asked this question, and there are many answers. Let us first take a look at the concept of these three decoration methods.

All-inclusive: also known as "turnkey" project, that is, the procurement of all main and auxiliary materials is borne by the decoration company, and the owner only uses the final completion acceptance.

Many people think that this method is the most time-saving, trouble-saving, and worry-free, as long as you pay on time. But this kind of drawback is very great. There are too many tricks in it and it can be described as "preventive." In the face of a new house, which owners do not want to decorate the glorious, not only to meet the simple living requirements, but also to meet the practical functionality and environmental protection requirements.

However, there is no uniform standard in the decoration industry at present, there is no professional certified construction personnel, there is no strict construction process, or the owner does not have a knock on the industry, and the "one hammer" trading characteristics. "All-inclusive" leads to poor quality of the final construction. Not only has the money not been saved, but it also takes time and effort to pursue the responsibility of the decoration company.

I think the following people are suitable for all-inclusive:

1. Business people who are rich, but have no time, and know nothing about the decoration. (After enough to decorate the company enough profits, the material is also guaranteed)

2. Right, have enough rights to restrain the decoration company, at this time you let the decoration company cut corners and he will not.

3. The average person with little money and rights is not big, but the decoration effect is not high, or the owner who is preparing to decorate the house is used for rent.
In addition to the above three types of people, I think other friends still do not choose "all inclusive."

Half-package: The main materials such as ceramic tiles, flooring, cabinets, paints, electrical appliances, and sanitary ware are purchased by themselves, and the auxiliary materials other than them are borne by the decoration company.

This approach avoids many drawbacks and trickery of “all-inclusive”, but it also has its shortcomings: it seems that there are not many things in the decoration and accessories, but in fact it also accounts for a large part of the entire cost, and at the same time, the brands of auxiliary materials cannot be controlled. Who knows what the decoration company gives you, especially materials like paint, wires, water pipes, etc. If the materials are not good, it will lead to excessive pollutants, circuit fires, pipeline leaks and other serious consequences that will have a major impact on your subsequent life. influences. Suitable for fitting friends with a modest budget and little spare time.

Clearing: Purchasing all materials, only let the decoration team do the labor. Suitable for fitting budget is very tight, there is a lot of spare time, there is a certain discriminating power of the material quality and authenticity.

Here I would like to recommend a contracting method: "Cleaning accessories all-inclusive." It may be strange to hear this name. What kind of contracting is this? Now I explain to you in detail:

1. All packages for professional contractors can be packaged as much as possible. E.g:

The ceiling of the kitchen and toilet can choose to integrate the ceiling and allow the manufacturer to install it.

Cabinets are custom-built by manufacturers.

Doors and windows can be ordered with a set of doors and windows, measured by the manufacturers, production, installation.

Wood floors are purchased and installed by the same manufacturer.

Water pipe wiring and installation directly to the factory all completed.

Not only is the quality guaranteed, but it also has a certain amount of after-sales service. The total price is calculated to be similar to that of the decoration company, but the effect is much better than letting the construction team do something.

2. Unclear things are all packaged to the decoration company. Such as:

With gypsum board ceilings and TV backdrops, you can't really know the exact amount of wood, nails, glue, and you can contract the whole outfit to the outfit.

Marble window sill, pass the door stone.

PVC wire and tube.

Woodworking cabinets.

This item has a precondition: it must clearly specify the brand and model of the material and the construction process; it must calculate the specific quantity (such as the area of ​​the ceiling, the area of ​​the window sill, and the size of the cabinet); refer to the relevant price range and fix it. A reasonable price.

3. Something that can be calculated must buy its own main material, and the auxiliary material can be given to the decoration team. E.g:

Tiles, sealant purchase, cement yellow sand glue and other auxiliary materials to the decoration team.

Wires are purchased by themselves.

Silicone can be purchased by yourself.

Waterproof materials are purchased by themselves.

Decoration budget knowledge entrance decoration children's room decoration window door price TV decoration housing electrical gypsum board ceiling price decoration decoration decoration company okay new house decoration budget cabinet door cupboard cabinet door marble tile kitchen ceiling marble cabinet floor tile ceramic tile tile price floor tile background wall Tile ceramic tile background wall

1000 Series Aluminum Strip

Southeast Aluminum Sheet Co., Ltd. , http://www.jsaluminumplates.com